Automatic Door Maintenance
Planned maintenance is the booked visit that keeps a powered door safe, legal and working. It is cheaper than waiting for a breakdown, and it gives you the record you need if anyone is ever hurt.

What planned maintenance covers
- Safety functionsSensors, safety beams, stop and reverse, and the force the door closes with.
- Moving partsTracks, rollers, belts, hinges and arms cleaned, adjusted and lubricated where the maker says.
- Escape and power lossBreak-out panels, manual opening and battery back-up tested.
- The recordA written report and a logbook entry, with faults and parts listed.
Why a working door can still fail a safety check
A door that opens and closes every day can still be unsafe. Sensors drift out of alignment, closing force creeps up as parts wear, and a safety beam can be knocked so it no longer covers the opening. None of that is obvious to staff. It is exactly what a planned visit is for: the engineer tests each safety function against the standard rather than just watching the door move.
The law asks for powered doors to have safety features that stop them trapping people, and for those features to keep working (Workplace Regulations, regulation 18). A maintenance visit is how you show they do.
Setting the right number of visits
Start from the maker's instructions, which set the interval for that operator. Then think about traffic and who uses the door. CIBSE sets out a yearly safety inspection as a minimum, plus maintenance in line with the maker's recommendations and weekly checks by the occupier. A quiet staff door may need one or two visits a year. A supermarket entrance or a care home door used by frail residents will often need four.
The new UK code of practice, BS 7036:2026, asks owners to think about who could reasonably use the entrance, including children, older people and disabled users, when deciding how much protection a door needs (BSI). Our regulations page covers it in more detail.
Weekly checks your own staff can do
Between visits, someone on site should walk through a short check each week: the door opens and closes smoothly, it stops and reverses when the opening is blocked, glass and guards are undamaged, signs are in place and nothing is stored in the door's path. Write the date and initials in the logbook. Our post on doors that will not open or close lists what to check before calling an engineer.
Planned visits can be bought one at a time or as a contract. See maintenance contracts for what each level of cover includes, and the price page for typical costs.
What the rules say about this work
A planned visit is how most sites meet the duty to keep powered doors maintained. The record of it is your evidence.
Which rules cover a powered door?
Regulation 18 of the Workplace Regulations 1992 wants features that stop a powered door trapping anyone; regulation 5 wants it kept in efficient working order under a maintenance system.
When is the next visit due?
CIBSE guidance: a safety inspection by a trained engineer at least yearly, maintenance at the maker's interval, and an occupier's check each week. Busy entrances often need two to four visits.
What should the engineer leave?
Ask for a written report and a dated logbook line per visit, naming the BS EN 16005 tests, faults and parts. Any maintenance log has to stay current (PUWER 1998, reg. 5).
BS 7036:2026 and the rest are on the regulations page.
Questions about planned maintenance
How long does a service visit take?
It depends on the door type and its condition. A single swing or sliding door is usually a short visit; a revolving door takes longer. Ask the firm to state the time on site in its quote.
Does the door have to be out of use?
Only for parts of the visit. Most firms keep the entrance usable, or book the visit outside opening hours for a busy shop.
Is a yearly visit enough?
It is the minimum for the safety inspection (CIBSE). Many sites need more, depending on the maker's interval, traffic and who uses the door.
Get a quote for planned maintenance
A postcode for the building is enough to start. Door details can follow.
No charge to you. We line up one door engineer that covers your area and tell you who it is first; your details only go to it after you agree.
Sent. Watch your inbox.
- Look out for an email naming the door engineer matched to your postcode.
- Answer yes to have your contact details shared with it, or no to stop there.
- Ask the engineer for a door survey and a written price before booking.